Invitation to Bid

2024

* - Bidding of Various Items (Download to view the items)

2023

* - Bidding of Various Items (Download to view the items)

* - Bidding of Various Items (Download to view the items)

* - Bidding of Various Items (Download to view the items)

* - Upgrading of Magic Software Version and License

* - Engineering, Design, Supply, Delivery, Installation, Test and Commissioning of Extension of Distribution Line, Installation of KWH Meters, Service Drop Wires, and House Wiring Materials for Ten (10) Sitios

* - Supply and Delivery of Tools and Equipment for Lineman Use

* - Provision of Security Services for ANTECO Main Office, Area Offices, Collection Centers, Switch Yard and Substation Facilities for a Term of One (1) Year

* - Panay-Guimaras EC Power Consortium - Notice of Invitation for Direct Negotiation

* - Panay-Guimaras EC Power Consortium - Direct Negotiation Approved Terms of Reference

* - LOT 1 - Engineering Design, Supply, Delivery, Installation, Test and Commissioning of extension of distribution line, Installation of KWH Meters, Service Drop Wires and House Wiring Materials for Ten (10) Sitios

* - LOT 2 - Engineering Design, Supply, Delivery, Installation, Test and Commissioning of extension of distribution line, Installation of KWH Meters, Service Drop Wires and House Wiring Materials for Thirteen (13) Sitios

* - Supply and Delivery of Various Materials, KWH Meters, and Transformer Distribution for 2023 Coop Use

* - Supply, Delivery, Installation, Testing and Commissioning of Culasi Substation Fiber Optic Project San Jose to Culasi Substation Phase 1

* - Provision for Security Services for ANTECO

2022

* - Procurement of the Power Supply Requirement for Baseload, Intermediate and Peaking of seven Electric Cooperatives in Panay and Guimaras

Power Rates

January 2020

February 2020

March 2020

April 2020

May 2020

June 2020

July 2020

August 2020

September 2020

October 2020

November 2020

December 2020

January 2021

February 2021

 

 

Billing Rates

Breakdown of Generation Charges

February 2024

Download Download

January 2024

Download Download

December 2023

Download Download

November 2023

Download Download

October 2023

Download Download

September 2023

Download Download

August 2023

Download Download

July 2023

Download Download

June 2023

Download Download

May 2023

Download Download

April 2023

Download Download

March 2023

Download Download

February 2023

Download Download

January 2023

Download Download

 

Daily Power Supply and Load Demand Outlook

Date: October 13, 2022

Morning
Afternoon
Evening
0001H to 1200H
1201H to 1800H
1801H to 2400H
Power Supply
16 MW 16 MW 16 MW
Maximum Load Demand
21 MW 21 MW 21 MW
Power Supply Reserve / (Deficit)
(-5 MW) (-5 MW) (-6 MW)

Definition of Terms

  • Daily Power Supply and Load Demand Outlook:
    • The forecasted EC's maximum load demand nominated a day ahead to the EC's power supply provider/s over a 24-hour period
  • Power Supply
    • The power to be supplied by the ECs power supply provider/s based on the EC's maximum load demand nominated a day ahead over a 24-hour period.
  • Maximum Load Demand
    • The forecasted EC's maximum load demand over a 24-hour period
  • Power Supply Reserve/(Deficit)
    • The difference between the power supply and EC's maximum load demand over a 24-hour period